'Failure-based design in Chandrayaan-3': ISRO update on India's moon mission

https://ift.tt/H7ZX61o
The Chandrayaan-3 mission will be launched at 2.35 pm on July 14, and the land is expected to soft-land on the lunar surface on August 23 or 24.

from Tech: Read the latest technology news along with mobile, gadgets, and laptops updates | Hindustan Times https://ift.tt/SX34Var

Post a Comment

Previous Post Next Post

About Me